31-001 over DEFIANCE DRAW
2.78 MI N OF JCT NM-118 · County 031, New Mexico · Built 1982 · 1 Lanes · 3,004 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.526667, -106.865
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 44 years old.
Nearby Bridges
US-550 over UNNAMED WATERWAY
Built 1977
US-550 over Rio Penasco
Built 2001
US-550 over UNNAMED WATERWAY
Built 1977
US-550 over UNNAMED WATERWAY
Built 1979
US-550 over Cuchilla Arroyo
Built 2001
US-550 over RIO SALADO
Built 1979
US-550 over UNNAMED WATERWAY
Built 1975
US-550 over ARROYO PIEDRA PARADA
Built 1979
NM-4 over JEMEZ RIVER
Built 1981
IRR/US-550 over UNNAMED WATERWAY
Built 1975
Bridge Details
- Structure #
- 000000000008511
- Year Built
- 1982
- Length
- 47.2 m (154.9 ft)
- Max Span
- 10.6 m
- Width
- 4 m (13.1 ft)
- Lanes
- 1
- Daily Traffic
- 3,004
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $81,000
- Total Project Cost
- $122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.