13-Z020 over GARFIELD CANAL
.23 M W OF NM187@MP 6.8 · County 013, New Mexico · Built 1964 · 2 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.724233, -107.247464
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 62 years old.
Nearby Bridges
NM-390 over GARFIELD CANAL
Built 1954
NM-390 over GARFIELD CANAL
Built 1954
NM-187 over UNNAMED WATERWAY
Built 1931
NM-187 over UNNAMED WATERWAY
Built 1931
13-Z030 over GARFIELD CANAL
Built 1979
NM-187 over UNNAMED WATERWAY
Built 1931
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
13-E391 over RIO GRANDE
Built 1958
13-Z022 over GARFIELD CANAL
Built 1961
Bridge Details
- Structure #
- 000000000007717
- Year Built
- 1964
- Reconstructed
- 1996
- Length
- 13 m (42.7 ft)
- Max Span
- 5.8 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 337
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $29,000
- Total Project Cost
- $43,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.