13-E391 over RIO GRANDE
0.7 MI W JCT NM-187/SALEM · County 013, New Mexico · Built 1958 · 2 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.688847, -107.213528
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 68 years old.
Nearby Bridges
NM-187 over UNNAMED WATERWAY
Built 1931
NM-187 over RIO GRANDE
Built 2000
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-187 over UNNAMED WATERWAY
Built 1931
I-25 SBL/NBL over UNNAMED WATERWAY
Built 1965
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-390 over GARFIELD CANAL
Built 1954
NM-187 over PLACITAS ARROYO
Built 2009
NM-26 over PLACITAS ARROYO
Built 1969
Bridge Details
- Structure #
- 000000000005831
- Year Built
- 1958
- Length
- 146.9 m (482 ft)
- Max Span
- 12.2 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 337
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $499,000
- Total Project Cost
- $748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.