13-Z030 over GARFIELD CANAL
0.3 MI W NM-390 @ MP 3.9 · County 013, New Mexico · Built 1979 · 2 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.735561, -107.271378
This bridge is in worse condition than 64% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 47 years old.
Nearby Bridges
NM-187 over UNNAMED WATERWAY
Built 1931
NM-390 over GARFIELD CANAL
Built 1954
13-Z020 over GARFIELD CANAL
Built 1964
13-Z022 over GARFIELD CANAL
Built 1961
NM-390 over GARFIELD CANAL
Built 1954
NM-436 over GARFIELD CANAL
Built 1953
NM-187 over UNNAMED WATERWAY
Built 1931
13-E066 over IRRIGATION CANAL
Built 1966
NM-546 over I-25 NBL and SBL
Built 1965
NM-187 over UNNAMED WATERWAY
Built 1931
Bridge Details
- Structure #
- 000000000008192
- Year Built
- 1979
- Length
- 15.7 m (51.5 ft)
- Max Span
- 7.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 337
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $49,000
- Total Project Cost
- $74,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.