NM-390 over GARFIELD CANAL
2.9 MI NW OF NM-187/SALEM · County 013, New Mexico · Built 1954 · 1 Lanes · 398 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.727314, -107.257489
This bridge is in worse condition than 88.9% of bridges in County 013. The average bridge in New Mexico is 0 years old; this one is 72 years old.
Nearby Bridges
13-Z020 over GARFIELD CANAL
Built 1964
NM-187 over UNNAMED WATERWAY
Built 1931
13-Z030 over GARFIELD CANAL
Built 1979
NM-390 over GARFIELD CANAL
Built 1954
NM-187 over UNNAMED WATERWAY
Built 1931
NM-187 over UNNAMED WATERWAY
Built 1931
13-Z022 over GARFIELD CANAL
Built 1961
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
NM-436 over GARFIELD CANAL
Built 1953
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1965
Bridge Details
- Structure #
- 000000000005278
- Year Built
- 1954
- Length
- 18.9 m (62 ft)
- Max Span
- 6.1 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 398
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,000
- Total Project Cost
- $66,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.