I-25 NBL over Rio Salado

9.6 M N Jct NM-408/I-25 · County 053, New Mexico · Built 1958 · 2 Lanes · 12,028 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000005959
Year Built
1958
Reconstructed
2012
Length
154.3 m (506.2 ft)
Max Span
15.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,028
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,450,000
Total Project Cost
$6,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.