Gravel Road over Low Flow Cannel
San Acacia · County 053, New Mexico · Built 1995 · 2 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.248092, -106.901856
This bridge is in worse condition than 50.8% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 31 years old.
Nearby Bridges
53Z001 over I25 NBL/SBL @ MP-163
Built 1958
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
NM-408 over SOCORRO MAIN CANAL
Built 1955
FR-2044 over UNNAMED WATERWAY
Built 1932
FR-2044 over UNNAMED WATERWAY
Built 1932
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1958
FR-2044 over UNNAMED WATERWAY
Built 1932
Bridge Details
- Structure #
- 0401-SA1
- Year Built
- 1995
- Length
- 13.8 m (45.3 ft)
- Max Span
- 13.4 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.