53Z001 over I25 NBL/SBL @ MP-163
4.8 M N Jct NM-408/I-25 · County 053, New Mexico · Built 1958 · 2 Lanes · 58 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
34.253847, -106.908589
This bridge is in worse condition than 95.2% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 68 years old.
Nearby Bridges
Gravel Road over Low Flow Cannel
Built 1995
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
NM-408 over SOCORRO MAIN CANAL
Built 1955
I-25 NBL over Rio Salado
Built 1958
I-25 SBL over Rio Salado
Built 1958
FR-2044 over UNNAMED WATERWAY
Built 1932
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1958
Bridge Details
- Structure #
- 000000000005842
- Year Built
- 1958
- Length
- 71.9 m (235.9 ft)
- Max Span
- 17.1 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 58
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $226,000
- Total Project Cost
- $339,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.