NM-408 over SOCORRO MAIN CANAL
5.4 M EAST OF LEMITAR · County 053, New Mexico · Built 1955 · 2 Lanes · 123 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.218097, -106.909372
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 71 years old.
Nearby Bridges
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
FR-2044 over UNNAMED WATERWAY
Built 1932
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1958
FR-2044 over UNNAMED WATERWAY
Built 1932
FR-2044 over UNNAMED WATERWAY
Built 1932
I-25 NBL over San Lorenzo Arroyo
Built 1958
I-25 SBL over San Lorenzo Arroyo
Built 1958
FR-2044 over UNNAMED WATERWAY
Built 1932
FR-2044 over ARROYO DEL PUERTECITO
Built 2009
Bridge Details
- Structure #
- 000000000005479
- Year Built
- 1955
- Length
- 9.9 m (32.5 ft)
- Max Span
- 9.4 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 123
- Material
- Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,000
- Total Project Cost
- $53,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.