CAUSEWAY over JOE ENGLISH POND

0.2 MILES FROM ON-ORBIT D · County 011, New Hampshire · Built 2008 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
AFNHRNGF00241
Year Built
2008
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$25,000
Total Project Cost
$38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.