BROOK ROAD over JOE ENGLISH BROOK

1.4 MI FR DODGE/AUSTIN R · County 011, New Hampshire · Built 1985 · 2 Lanes · 208 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000700630011800
Year Built
1985
Length
7.6 m (24.9 ft)
Max Span
1.8 m
Lanes
2
Daily Traffic
208
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.