NH101 over JOE ENGLISH BROOK

1.15 MI SW BEDFORD TL · County 011, New Hampshire · Built 1936 · 2 Lanes · 19,233 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000700930013900
Year Built
1936
Reconstructed
1960
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
19,233
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.