HORACE GREELEY RD over PULPIT BROOK
0.1 MI BEDFORD TL · County 011, New Hampshire · Built 2018 · 2 Lanes · 794 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.923819, -71.580008
This bridge is in worse condition than 17.7% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 8 years old.
Nearby Bridges
NH101 over PULPIT BROOK
Built 2023
NH101 over JOE ENGLISH BROOK
Built 1936
HORACE GREELEY RD over JOE ENGLISH BROOK
Built 1989
BROOK ROAD over JOE ENGLISH BROOK
Built 1985
STOWELL ROAD over BABOOSIC BROOK
Built 1990
BEALS ROAD over BABOOSIC BROOK
Built 1928
ACCESS ROAD over JOE ENGLISH BROOK
Built 2008
MAGAZINE STREET over RIDDLE BROOK
Built 2013
MAGAZINE STREET over RIDDLE BROOK
Built 2013
CAUSEWAY over JOE ENGLISH POND
Built 2008
Bridge Details
- Structure #
- 000700600015800
- Year Built
- 2018
- Length
- 13.7 m (44.9 ft)
- Max Span
- 12.2 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 794
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.