ON-ORBIT DRIVE over GARDNER-JOE ENGLISH STRE

1.2 MILES FROM MAIN GATE. · County 011, New Hampshire · Built 1959 · 2 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Culvert
3
Serious

Bridge Details

Structure #
AFNHRNGF00243
Year Built
1959
Length
8.5 m (27.9 ft)
Max Span
1.8 m
Lanes
2
Daily Traffic
10
Material
Steel
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$115,000
Total Project Cost
$173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.