US 3 NH 11 over WINNISQUAM LAKE

SANBORNTON-BELMONT TL · County 001, New Hampshire · Built 1973 · 2 Lanes · 16,322 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023102310007300
Year Built
1973
Reconstructed
2006
Length
144.5 m (474.1 ft)
Max Span
39.6 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
16,322
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000