GREY ROCKS ROAD over NHRR

0.3 MI FROM TILTON TL · County 001, New Hampshire · Built 2000 · 2 Lanes · 510 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
002000520011100
Year Built
2000
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
510
Material
Steel
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.