SOUTH ROAD over BELMONT RIVER

6.2 MI FROM LACONIA TL · County 001, New Hampshire · Built 1988 · 2 Lanes · 872 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
002000660006600
Year Built
1988
Length
13.7 m (44.9 ft)
Max Span
6.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
872
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.