SILVER LAKE ROAD over HYDRO CANAL

.25 MI E OF US RTE. 3 · County 001, New Hampshire · Built 1984 · 2 Lanes · 1,706 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
025601330009400
Year Built
1984
Length
9.8 m (32.2 ft)
Max Span
4.6 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
1,706
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.