US 3 NH 11 NH132 over I-93

.1 MI WINNIPESAUKEE RIVER · County 001, New Hampshire · Built 2000 · 4 Lanes · 23,105 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
025601000006100
Year Built
2000
Length
78.3 m (256.9 ft)
Max Span
38.1 m
Width
29.3 m (96.1 ft)
Lanes
4
Daily Traffic
23,105
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.