I-93 SB over OLD NH 3B

TILTON-SANBORTON TL · County 001, New Hampshire · Built 1962 · 2 Lanes · 14,214 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
023101520003900
Year Built
1962
Reconstructed
1986
Length
41.1 m (134.8 ft)
Max Span
16.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
14,214
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.