NH106 over US 3 NH 11

.4 MI BELMONT TL · County 001, New Hampshire · Built 1964 · 3 Lanes · 11,620 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013901320002700
Year Built
1964
Reconstructed
2019
Length
18.6 m (61 ft)
Max Span
16.2 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
11,620
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.