US 3 NH 11 over NH107

1.5 MI FROM BELMONT T.L. · County 001, New Hampshire · Built 1963 · 2 Lanes · 8,834 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013901360002700
Year Built
1963
Reconstructed
1993
Length
41.5 m (136.2 ft)
Max Span
17.7 m
Width
16.4 m (53.8 ft)
Lanes
2
Daily Traffic
8,834
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.