US 3 BUS NH 11A over DURKEE BROOK

.4 MI N.E. BELMONT T.L. · County 001, New Hampshire · Built 2022 · 3 Lanes · 13,077 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
013901130003600
Year Built
2022
Length
12.1 m (39.7 ft)
Max Span
9.6 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
13,077
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.