US 4 NH 16 SP TPK over GOSLING ROAD

1.2 MI N JCT I-95 · County 015, New Hampshire · Built 1993 · 6 Lanes · 59,897 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021702090017900
Year Built
1993
Length
34.4 m (112.9 ft)
Max Span
33.5 m
Width
42.8 m (140.4 ft)
Lanes
6
Daily Traffic
59,897
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000