US 3 over PERRY STREAM OVERFLOW

5.0 MI EAST NH145 · County 007, New Hampshire · Built 1996 · 2 Lanes · 1,586 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
021001310005800
Year Built
1996
Length
8.5 m (27.9 ft)
Max Span
7.3 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,586
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.