US 3 over CONNECTICUT RIVER
17.4 MI E OF ROUTE 145 · County 007, New Hampshire · Built 1961 · 2 Lanes · 89 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
45.189464, -71.189986
This bridge is in worse condition than 55.6% of bridges in County 007. The average bridge in New Hampshire is 0 years old; this one is 65 years old.
Bridge Details
- Structure #
- 021001960013000
- Year Built
- 1961
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Lanes
- 2
- Daily Traffic
- 89
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.