US 3 over CONNECTICUT RIVER

17.4 MI E OF ROUTE 145 · County 007, New Hampshire · Built 1961 · 2 Lanes · 89 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Culvert 6 Satisfactory

Location

45.189464, -71.189986

This bridge is in worse condition than 55.6% of bridges in County 007. The average bridge in New Hampshire is 0 years old; this one is 65 years old.

Nearby Bridges

Bridge Details

Structure #
021001960013000
Year Built
1961
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
89
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.