US 3 over INDIAN STREAM

2.5 MI N OF CLARKSVILLETL · County 007, New Hampshire · Built 1976 · 2 Lanes · 1,342 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021000700003200
Year Built
1976
Reconstructed
2014
Length
28.7 m (94.2 ft)
Max Span
27.4 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,342
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.