NH145 over CONNECTICUT RIVER

PITTSBURG TL · County 007, New Hampshire · Built 2006 · 2 Lanes · 723 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
004800900012100
Year Built
2006
Length
26.4 m (86.6 ft)
Max Span
25.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
723
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.