US 3 over CONNECTICUT RIVER

PITTSBURG TL · County 007, New Hampshire · Built 1931 · 2 Lanes · 1,342 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
004800300006600
Year Built
1931
Reconstructed
1984
Length
67.4 m (221.1 ft)
Max Span
30.8 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,342
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.