BELKNAP AVENUE over SUGAR RIVER

0.2 MI FR NO. MAIN ST · County 019, New Hampshire · Built 1974 · 2 Lanes · 1,141 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019201310010600
Year Built
1974
Reconstructed
2006
Length
27.9 m (91.5 ft)
Max Span
25.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,141
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.