CROSS STREET over SUGAR RIVER

0.12 MI FR SUNAPEE ST · County 019, New Hampshire · Built 1983 · 2 Lanes · 1,833 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019201440010400
Year Built
1983
Reconstructed
1994
Length
17.7 m (58.1 ft)
Max Span
15.2 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
1,833
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.