OAK STREET over SUGAR RIVER

0.4 MI FR NO. NEWPORT RD · County 019, New Hampshire · Built 2019 · 2 Lanes · 585 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
019201030013600
Year Built
2019
Length
38.1 m (125 ft)
Max Span
37.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
585
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.