NH 11 NH103 over SUGAR RIVER PED TRAIL

2.2 MI FROM CLAREMONT TL · County 019, New Hampshire · Built 1998 · 2 Lanes · 9,959 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019200850010100
Year Built
1998
Length
53.3 m (174.9 ft)
Max Span
51.8 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
9,959
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.