CORBIN BRIDGE ROAD over CROYDON BRANCH SUGAR R

.69 MI JCT NH 10 · County 019, New Hampshire · Built 1845 · 1 Lanes · 545 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
019201160014200
Year Built
1845
Reconstructed
1994
Length
31.7 m (104 ft)
Max Span
29.3 m
Width
5.7 m (18.7 ft)
Lanes
1
Daily Traffic
545
Material
Wood or Timber
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.