NH130 BROAD STREET over US 3 FEE TPK

.2 MI FROM COLISEUM AVE · County 011, New Hampshire · Built 1999 · 8 Lanes · 26,909 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017700970012100
Year Built
1999
Length
65.5 m (214.9 ft)
Max Span
32 m
Width
36.6 m (120.1 ft)
Lanes
8
Daily Traffic
26,909
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.