US 3 FEE TPK SB over CANAL SERVICE ROAD
0.5 MI FROM NH 130 · County 011, New Hampshire · Built 1959 · 4 Lanes · 58,948 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.76055, -71.493433
This bridge is in worse condition than 27% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 67 years old.
Nearby Bridges
US 3 FEE TPK NB over CANAL SERVICE ROAD
Built 1955
US 3 FEE TPK SB over NASHUA RIVER
Built 1959
US 3 FEE TPK NB over NASHUA RIVER
Built 1955
NH130 BROAD STREET over US 3 FEE TPK
Built 1999
PINE HILL ROAD over US 3 FEE TPK
Built 1994
NH111 over US 3 FEE TPK
Built 1998
BALDWIN STREET over BROAD ST PKWY CSX
Built 2014
FAIRMOUNT STREET over BROAD ST PKWY CSX
Built 2015
BROAD ST PARKWAY over NASHUA RIVER
Built 2016
NH101A over FEE TPK
Built 1999
Bridge Details
- Structure #
- 017701000011200
- Year Built
- 1959
- Reconstructed
- 1996
- Length
- 63.4 m (208 ft)
- Max Span
- 30.5 m
- Width
- 25.3 m (83 ft)
- Lanes
- 4
- Daily Traffic
- 58,948
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.