US 3 FEE TPK NB over NASHUA RIVER

0.3 MI FROM NH 130 · County 011, New Hampshire · Built 1955 · 6 Lanes · 73,979 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017701010011800
Year Built
1955
Reconstructed
1996
Length
103 m (337.9 ft)
Max Span
27.4 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
73,979
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.