US 3 FEE TPK NB over CANAL SERVICE ROAD
0.5 MI FROM NH 130 · County 011, New Hampshire · Built 1955 · 5 Lanes · 59,758 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.760714, -71.493133
This bridge is in worse condition than 60.8% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 71 years old.
Nearby Bridges
US 3 FEE TPK SB over CANAL SERVICE ROAD
Built 1959
US 3 FEE TPK SB over NASHUA RIVER
Built 1959
US 3 FEE TPK NB over NASHUA RIVER
Built 1955
NH130 BROAD STREET over US 3 FEE TPK
Built 1999
PINE HILL ROAD over US 3 FEE TPK
Built 1994
BALDWIN STREET over BROAD ST PKWY CSX
Built 2014
NH111 over US 3 FEE TPK
Built 1998
FAIRMOUNT STREET over BROAD ST PKWY CSX
Built 2015
BROAD ST PARKWAY over NASHUA RIVER
Built 2016
NH101A over FEE TPK
Built 1999
Bridge Details
- Structure #
- 017701010011200
- Year Built
- 1955
- Reconstructed
- 1996
- Length
- 63.4 m (208 ft)
- Max Span
- 30.5 m
- Width
- 25.6 m (84 ft)
- Lanes
- 5
- Daily Traffic
- 59,758
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.