WATER STREET over FACTORY ACCESS ROAD

0.13 MI FR MAIN ST · County 011, New Hampshire · Built 1962 · 2 Lanes · 5,082 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
017701260011200
Year Built
1962
Reconstructed
1986
Length
54.6 m (179.1 ft)
Max Span
20.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
5,082
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.