CANAL STREET over NASHUA RIVER
0.6 MI FROM ROUTE 3 · County 011, New Hampshire · Built 1928 · 2 Lanes · 14,902 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.763653, -71.454936
This bridge is in worse condition than 60.8% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 98 years old.
Nearby Bridges
DANIEL WEBSTER HWY over NASHUA RIVER
Built 1925
NH111 EB over MERRIMACK RIVER
Built 1973
NH111 WB over MERRIMACK RIVER
Built 1970
WATER STREET over FACTORY ACCESS ROAD
Built 1962
BROAD ST PARKWAY over NASHUA RIVER
Built 2016
ALLDS STREET over SALMON BROOK
Built 1892
FAIRMOUNT STREET over BROAD ST PKWY CSX
Built 2015
BALDWIN STREET over BROAD ST PKWY CSX
Built 2014
DANIEL WEBSTER HWY over US 3 FEE TPK NB RAMP
Built 1955
US 3 FEE TPK NB over NASHUA RIVER
Built 1955
Bridge Details
- Structure #
- 017701390011500
- Year Built
- 1928
- Length
- 48.8 m (160.1 ft)
- Max Span
- 23.2 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 14,902
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.