NH 9 over MALLEGO BROOK
1.2MI FROM BARRINGTON TL · County 017, New Hampshire · Built 1960 · 2 Lanes · 8,063 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.19595, -70.949225
This bridge is in worse condition than 64% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 66 years old.
Nearby Bridges
NUTE ROAD over BELLAMY RIVER
Built 2022
WATSON ROAD over COCHECO RIVER
Built 1986
NH155 over BELLAMY RIVER
Built 1982
NH155 over CSX
Built 2007
ROCHESTER NECK RD over ISINGLASS RIVER
Built 1979
TOLEND ROAD over NH 16 SP TPK
Built 1957
NH 9 over BMRR
Built 2011
NH 16 SP TPK SB over COCHECO RIVER
Built 1957
NH 16 SP TPK NB over COCHECO RIVER
Built 1957
WHITTIER STREET over COCHECO RIVER
Built 2018
Bridge Details
- Structure #
- 015900710010000
- Year Built
- 1960
- Reconstructed
- 1998
- Length
- 16.5 m (54.1 ft)
- Max Span
- 14.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 8,063
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.