NUTE ROAD over BELLAMY RIVER

0.4 BARRINGTON TL · County 017, New Hampshire · Built 2022 · 2 Lanes · 116 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.1878, -70.977797

This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
015900560007200
Year Built
2022
Length
11.6 m (38.1 ft)
Max Span
9.6 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
116
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.