NUTE ROAD over BELLAMY RIVER
0.4 BARRINGTON TL · County 017, New Hampshire · Built 2022 · 2 Lanes · 116 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.1878, -70.977797
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 4 years old.
Nearby Bridges
NH 9 over MALLEGO BROOK
Built 1960
MALLEGO ROAD over MALLEGO BROOK
Built 2020
US 4 over NH155
Built 1968
NH155 over CSX
Built 2007
US 4 over OYSTER RIVER
Built 1929
US 4 over NH155A
Built 1968
NH155 over BELLAMY RIVER
Built 1982
MADBURY ROAD over CSX
Built 1980
US 4 over CSX
Built 1966
ROCHESTER NECK RD over ISINGLASS RIVER
Built 1979
Bridge Details
- Structure #
- 015900560007200
- Year Built
- 2022
- Length
- 11.6 m (38.1 ft)
- Max Span
- 9.6 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 116
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.