NH155 over BELLAMY RIVER

.2MI FROM DOVER TL · County 017, New Hampshire · Built 1982 · 2 Lanes · 11,771 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.174406, -70.917892

This bridge is in worse condition than 30.1% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 44 years old.

Nearby Bridges

Bridge Details

Structure #
015901200009600
Year Built
1982
Length
24.4 m (80.1 ft)
Max Span
22.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
11,771
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.