NH 9 over BMRR

2 MI. FROM MADBURY TL6 · County 017, New Hampshire · Built 2011 · 2 Lanes · 9,696 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
006501090010600
Year Built
2011
Length
38.4 m (126 ft)
Max Span
17.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
9,696
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000