FOURTH STREET over COCHECO RIVER

DOWNTOWN DOVER · County 017, New Hampshire · Built 1978 · 2 Lanes · 2,189 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
006501230012600
Year Built
1978
Length
54.6 m (179.1 ft)
Max Span
26.8 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
2,189
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.