FOURTH STREET over COCHECO RIVER
DOWNTOWN DOVER · County 017, New Hampshire · Built 1978 · 2 Lanes · 2,189 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.1998, -70.882281
This bridge is in worse condition than 30.1% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 48 years old.
Nearby Bridges
CHESTNUT STREET over COCHECO RIVER
Built 1975
WASHINGTON STREET over CSX
Built 1907
NH 9 NH108 NB over COCHECO RIVER
Built 1977
NH 9 NH108 SB over COCHECO RIVER
Built 1976
WHITTIER STREET over COCHECO RIVER
Built 2018
WASHINGTON STREET over COCHECO RIVER
Built 2010
TOLEND ROAD over NH 16 SP TPK
Built 1957
NH 16 SP TPK SB over BMRR
Built 1957
NH 16 SP TPK NB over BMRR
Built 1957
NH 16 SP TPK NB over COCHECO RIVER
Built 1957
Bridge Details
- Structure #
- 006501230012600
- Year Built
- 1978
- Length
- 54.6 m (179.1 ft)
- Max Span
- 26.8 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,189
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.