TOLEND ROAD over NH 16 SP TPK
1.4 MI FROM JCT. 16 · County 017, New Hampshire · Built 1957 · 2 Lanes · 4,112 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.199986, -70.896806
This bridge is in worse condition than 30.1% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 69 years old.
Nearby Bridges
WHITTIER STREET over COCHECO RIVER
Built 2018
NH 16 SP TPK NB over COCHECO RIVER
Built 1957
NH 16 SP TPK SB over COCHECO RIVER
Built 1957
SIXTH STREET over NH 16 SP TPK
Built 1957
WASHINGTON STREET over CSX
Built 1907
NH 16 SP TPK SB over BMRR
Built 1957
NH 16 SP TPK NB over BMRR
Built 1957
FOURTH STREET over COCHECO RIVER
Built 1978
NH 9 over BMRR
Built 2011
GLENWOOD AVENUE over NH 16 SP TPK
Built 1957
Bridge Details
- Structure #
- 006501060012500
- Year Built
- 1957
- Reconstructed
- 2003
- Length
- 63.1 m (207 ft)
- Max Span
- 14.3 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 4,112
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.