NH 9 NH108 SB over COCHECO RIVER

0.1 MI JCT NH 4 · County 017, New Hampshire · Built 1976 · 2 Lanes · 5,430 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
006501310012300
Year Built
1976
Length
42.7 m (140.1 ft)
Max Span
20.7 m
Width
24.8 m (81.4 ft)
Lanes
2
Daily Traffic
5,430
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.