OAK STREET over CSX
DOVER-ROLLINSFORD TL · County 017, New Hampshire · Built 1890 · 2 Lanes · 8,749 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
2
Critical
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 2 | Critical |
| Substructure | 5 | Fair |
Location
43.207133, -70.864592
This bridge is in worse condition than 98.5% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 136 years old.
Nearby Bridges
NH 9 NH108 NB over COCHECO RIVER
Built 1977
WASHINGTON STREET over COCHECO RIVER
Built 2010
NH 9 NH108 SB over COCHECO RIVER
Built 1976
CHESTNUT STREET over COCHECO RIVER
Built 1975
FOURTH STREET over COCHECO RIVER
Built 1978
WASHINGTON STREET over CSX
Built 1907
GLENWOOD AVENUE over NH 16 SP TPK
Built 1957
WHITTIER STREET over COCHECO RIVER
Built 2018
GULF ROAD over FRESH CREEK
Built 1948
SIXTH STREET over NH 16 SP TPK
Built 1957
Bridge Details
- Structure #
- 022300690004600
- Year Built
- 1890
- Reconstructed
- 1928
- Length
- 19.8 m (65 ft)
- Max Span
- 19.2 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 8,749
- Material
- Steel
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.