OAK STREET over CSX

DOVER-ROLLINSFORD TL · County 017, New Hampshire · Built 1890 · 2 Lanes · 8,749 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
2
Critical
Substructure
5
Fair

Bridge Details

Structure #
022300690004600
Year Built
1890
Reconstructed
1928
Length
19.8 m (65 ft)
Max Span
19.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
8,749
Material
Steel
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.