MALLEGO ROAD over MALLEGO BROOK
0.7 MI FR RTE 125&9 · County 017, New Hampshire · Built 2020 · 2 Lanes · 665 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
43.20795, -71.009694
This bridge is in worse condition than 9.6% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 6 years old.
Nearby Bridges
NUTE ROAD over BELLAMY RIVER
Built 2022
GREENHILL ROAD over ISINGLASS RIVER
Built 1955
US202 over ISINGLASS RIVER
Built 1934
NH 9 over MALLEGO BROOK
Built 1960
NH125 over ISINGLASS RIVER
Built 1951
ROCHESTER NECK RD over ISINGLASS RIVER
Built 1979
STILLWATER CIRCLE over BROOK
Built 1988
US 4 over OYSTER RIVER
Built 1929
NH126 over ISINGLASS RIVER
Built 1947
US 4 over NH155
Built 1968
Bridge Details
- Structure #
- 001501390011600
- Year Built
- 2020
- Length
- 13.5 m (44.3 ft)
- Max Span
- 11.8 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 665
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.