NH126 over ISINGLASS RIVER

0.8 MI FROM STRAFFORD TL · County 017, New Hampshire · Built 1947 · 2 Lanes · 1,264 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001500520010800
Year Built
1947
Length
12.2 m (40 ft)
Max Span
10.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,264
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.